High Flow

High Flow

Setup is simple and completed in minutes:

Step 1 – unload and stand in place, no guy wires

Step 2 – tie in waste gas line and pilot fuel source

Step 3 – hook up generator or power supply @ 480 volts / 3 phase / 60 amp service

Step 4 – open pilot fuel valve and push start button

AWI units are very safe and straightforward to operate.  With only a 20 minute set up, the units are L skid mounted, simple to load, transport and erect.  There are no anchors or guy wires needed allowing for zero ground disturbance.

Click to download the AWI High Flow Operation Procedure Manual

AWI Operation Procedure

Visit the gallery for video and images of offloading and set up

Compared to flaring, the AWI technology offers:

  • Combustion efficiency of 99.99% , with improved air quality and reduced greenhouse gas emissions
  • Stable, consistent combustion in an enclosed and lined chamber, unaffected by winds
  • No ground disturbance, free standing, no smoke, no visible flame, no odor
  • No heat radiation at ground level for improved protection of arctic/tundra or sensitive environments, personnel and equipment
  • 40 ft long x 11’ 6” wide x 16,500 Kg – oversized load permits are not required- no pilot trucks
  • Rated Capacity at 6 MM SCFD Methane or 3 MM SCFD Typical Well Gas.
  • Uses significantly less fuel than a flare to efficiently incinerate low heat content gases (H2S) with 99.99% combustion efficiency
  • Compliance with AER Directive 60
    • 40 ft exit elevation
    • Dual continuous pilots
    • Continuous temperature monitoring and recording